Customization: | Available |
---|---|
Door Type: | Swing Doors |
Flooring: | Steel Flooring |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Location: XPCL's strategic proximity to the Xiamen seaports offers a seamless transportation advantage, facilitating efficient logistics and timely delivery.
Price: We pledge to offer you highly competitive pricing, ensuring outstanding value for superior quality.
Production: Our robust facilities are capable of producing 250-300 units of 20GP containers per day, alongside 200-250 units of 40HC containers daily, reflecting our commitment to large-scale, efficient production.
Design capability: Our distinguished team consists of 20 seasoned engineers, each with over 8 years of industry expertise, driving innovative and bespoke design solutions.
The container adheres meticulously to and fully satisfies the following stringent standards:
1. ISO/TC-104
Ensuring full compliance with the very latest Series 1 freight container specifications, guaranteeing reliability and standardization.
2. T.I.R Requirements and Certifications
The container is meticulously crafted to align with the customers' Convention of Containers from 1972, including all subsequent amendments. It will be clearly marked with the requisite approval plates and certifications.
3. Timber Component Treatment and Certification
All visible timber components undergo treatment with an insecticide that has been sanctioned by the Australian government, with the container clearly marked with an appropriate immunization plate for authenticity and assurance.
4. U.I.C
The container is designed in strict adherence to the International Union of Railways (UIC) code 592 OR, ensuring full compliance.
5. CSC Requirements
Constructed in accordance with the International Convention for Safe Containers, the container will be distinctly labeled with an identifying plate, denoting its compliance with international safety standards.
6. Classification Society
Each container will receive certification from a recognized classification society, with rigorous design validation and individual inspections conducted throughout the production process, ensuring impeccable standards.
1. Do you have minimum order quantity?
The MOQ is 1 unit.
2. How about the lead time?
For customized container, the lead time is about 20-25 days. For shipping container, its about 7-15 days.
3. What's your payment terms?
By T/T, 30% pre-payment within 3 days after the order is confirmed, the balance must be settled before delivery.